|
The Mubarek Field is located 50 kilometers
offshore, north-north west of Sharjah, in 200 feet of water. BGOI
was granted the concession in 1969. There are two producing intervals,
the Ilam/Mishrif light oil reservoir at 12,500 feet and the deeper
Thamama gas condensate at 13,500 feet.
Prolific History. The Ilam/Mishrif reservoir in the Mubarek
field has a long history of development dating back to the
early 1970s. The first commercial oil was produced in mid-1974
in the Mubarek Field, marking the beginning of over three
decades of continuous production. At the peak of production,
the Mubarek Field was producing an estimated 60,000 barrels
of oil per day. Individual well cumulative production ranged
up to 22 million barrels. All wells have had reported recoveries
in excess of one million barrels.
The total estimated
cumulative recovery to date in the Mubarek Field exceeds
100 million barrels of oil. Sky Petroleum believes that this
program will achieve its objective to exploit and maximize
the potential of the substantial untapped oil reservoirs
known to exist in the Ilam/Mishrif reservoir.
Technical and operational support. Sky Petroleum's primary
focus is to seek opportunities where discoveries can be appraised
rapidly, and developments can be advanced by accessing existing
infrastructure, and benefiting from the extensive experience
of established operators.
The alliance with BGOI unites Sky Petroleum's subsidiary
Sastaro Limited with one of the United Arab Emirates most
established and successful, integrated, low-cost operators
with over 30 years of extensive experience in the region.
As established operators in the Mubarek Field for over three
decades, BGOI brings extensive knowledge of the geological
formations and reservoir potential of the Mubarek Field.
|
Mubarek Field is one
of the region’s prolific oil & gas
discoveries.
On continuous production since 1974.
Estimated cumulative production
of 100 million barrels of oil.
At peak of production Mubarek
FIELD was producing an estimated 60,000 barrels of oil per
day.
Fully equipped production facilities in place with ready
access to pipeline and transport infrastructure.
|